Skip to content
Workshop sheet for Superbe frame 0199
Open the full sheetThe order sheet, as it was filled in, including whatever was written in the margins.

Frame

0199

Untraced

“853” is written across the top corner, and a telephone number sits beside the frame number. The word after the top-tube figure reads “Sleping”, presumably sloping; the head angle is written over a correction and could as easily be 74°, and the fork-rake line is scribbled out entirely. Delivery promised 12/14 weeks with a deposit ticked. The attached page is a pencil sketch headed “Steeper seat angle” with “sloped front to rear 19½”, “MORE UPRIGHT” along the frame drawing, and jottings for the build: Ultegra/Dura Ace 18 speed, “Aero Carbon seat pin”, “Multi Adjust Head/Stem”, “Aero flat forks?” and “Wheels SPINERGY?”.

Ordered
30.9.98
Tubing
853
Frame
19¾"
Top tube
19¼" (Sleping)
Angles
72° / 75°
Ends
Columbus (short)
Chainstays
16 5/16"
Seatstays
Engraved top eyes (“Fast Back” struck out)
B/bracket
10⅝"
Wheels
Sprints (H.P.s struck out), no mudguard clearance
Brazed on
Gear lever bosses, A.K. seat lug, brake eyes 2 × L/H @ 45° on the top tube, TA bottle cage bosses (2 sets)
Finish
See diagram
Customer
Leslie Cliff, Radcliffe on Trent

Own this sheet

£110

A high-resolution print of the sheet, not the original. Giclée on enhanced matte art paper, mounted in snow white, glazed, in a solid wood frame. Free UK postage. £15 goes to Lincs & Notts Air Ambulance.

See it before you buy · Pay by card or PayPal · Free UK postage

The workshop sheet for frame 0199
0199
1998 · 853 · 19¾" · See diagram
Sid Standard Cycles · 35–37 Chilwell Road, Beeston
A print of the 0199 sheet, framed — to scale above a two-metre sofa

Own it? Remember it?

Nobody has come forward for 0199 yet. If it is in your shed, or you remember it being built, ridden or sold, send a photograph and whatever you know.

Send photographs and what you know

Read before anything appears · Nothing published without it

Filed with it

One more page in the folder

Kept in the folder with the worksheet and scanned with it: the build written out and ticked off as it was fitted, a letter, a sketch, the second side of the sheet. The worksheet is the record; these are what was going on around it. Tap one to read it full size.

Page filed with worksheet 0199
Sketch